ToDo

Printer-friendly versionPDF version

Things to do on the website:

  1. Add MAtoN functionality;
  2. Add IALA grid to non mobile stations;
  3. Check filesharing
  4. Add dates for input documents NCSR, ITU, IEC etc.;
  5. Find out if possible with Cesium to add coverage;
  6. Check EAVDAM ftp;
  7. Check ftp rights;
  8. Check synchronisation with IALA fileshare;
  9. Check wishes with chair.
  10. add link to managing station and reverse of non mobile stations
  11. integrate S-240 product specifiations.
English